Gas transmission pipeline · Beauregard Parish to Sabine Pass LNG
Creole Trail Pipeline
Creole Trail Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 151 km long and 15.33 bcm/y of capacity, starting up in 2008. It runs from Beauregard Parish to Sabine Pass LNG. It is owned by Cheniere Energy.
Length
151 km
Capacity
15.3 bcm/y
11.3 Mtpa LNG equivalent
Segments tracked
1
Route
Creole Trail Pipeline runs from Beauregard Parish to Sabine Pass LNG. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Beauregard Parish
- To
- Sabine Pass LNG
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 144 km
- GEM pipeline ID
- P0283
- Start year
- 2008
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main Line | Operating | Beauregard Parish → Sabine Pass LNG | 151 | 15.3 | — | 2008 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| G2 LNG Terminal | United States | Export | Cancelled | 0.7 km | route proximity |
| Woodside Louisiana LNG Terminal | United States | Export | Under construction | 1.1 km | route proximity |
| Sabine Pass LNG Terminal | United States | Export | Operating | 1.5 km | route proximity |
| Beacon Port LNG Terminal | United States | Import | Cancelled | 1.6 km | route proximity |
| Cameron LNG Terminal | United States | Export | Operating | 1.9 km | route proximity |
| Monkey Island LNG Terminal | United States | Export | Proposed | 1.9 km | route proximity |
| Commonwealth LNG Terminal | United States | Export | Under construction | 3.6 km | route proximity |
| Calcasieu Pass LNG Terminal | United States | Export | Operating | 3.9 km | route proximity |
| Magnolia LNG Terminal | United States | Export | Proposed | 4.4 km | route proximity |
| CP2 LNG Terminal | United States | Export | Under construction | 4.6 km | route proximity |
| Golden Pass LNG Terminal | United States | Export | Operating | 5.5 km | route proximity |
| Lake Charles LNG Terminal | United States | Import | Mothballed | 6.3 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 10.9 km | route proximity |
| Creole Trail LNG Terminal | United States | Import | Cancelled | 11.3 km | route proximity |
| Gulf Gateway Deepwater Port LNG Terminal | United States | Import | Retired | 11.3 km | route proximity |
| Alturas LNG Terminal | United States | Export | Cancelled | 15.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Cheniere Energy100%
Parent companies
- Cheniere Energy100%